Hi all,
Just after analyzed last mission, DCS shows active the "Build Next Mission" button. Two days after that, I've just opened it and it now shows active the "Analyze Last Mission" one. No change have been done in SEOW MP or DB.
Is ther a DB field that can be edited to change this status? DCS "thinks" that mission have been built, but thats not true.
Thanks!
DCS showing wrong campaign status
Moderator: SEOW Developers
-
- Posts: 2211
- Joined: Mon 08 Jan 2007 11:10 pm
- Location: Perth, Western Australia
Hi Vertex,
Sometimes, when Analyze times are very long, the DCS tends to lose connection to the DB and the final status command is not issued. The table Sector_Status contains the status information. Here are a few lines from a recent successful campaign:
Cheers,
4Shades
Sometimes, when Analyze times are very long, the DCS tends to lose connection to the DB and the final status command is not issued. The table Sector_Status contains the status information. Here are a few lines from a recent successful campaign:
Code: Select all
2 Italy Initialized 194209011200 Genova.mis 4
3 Italy Built 194209011300 SE-Genova-194209011300.mis 1
4 Italy Analyzed 194209011300 eventlog_SE-Genova-194209011300.lst 3
4Shades
IV/JG7_4Shades
SEOW Developer
SEOW Developer
-
- Posts: 2211
- Joined: Mon 08 Jan 2007 11:10 pm
- Location: Perth, Western Australia