Hello
I have a problem with the merge tool, I can not write the date in the field provided for this purpose
nothing appears when I type the date
I use the version of the Mission Planner v6.0.66 SEOW
Template Merger Tool
Moderator: SEOW Developers
-
- Posts: 15
- Joined: Sat 21 Aug 2010 10:29 am
- Location: france
- Contact:
-
- Posts: 2211
- Joined: Mon 08 Jan 2007 11:10 pm
- Location: Perth, Western Australia
-
- Posts: 15
- Joined: Sat 21 Aug 2010 10:29 am
- Location: france
- Contact:
-
- Posts: 2211
- Joined: Mon 08 Jan 2007 11:10 pm
- Location: Perth, Western Australia
-
- Posts: 15
- Joined: Sat 21 Aug 2010 10:29 am
- Location: france
- Contact:
-
- Posts: 2211
- Joined: Mon 08 Jan 2007 11:10 pm
- Location: Perth, Western Australia
Can you use the Merger Tool at SEOW HQ Mission Planner?
http://seowhq.net/MP4public/Merger/default.php
You just click on the Date field and a calendar tool pops up. No typing is required.
I wonder if your MP version is corrupted or missing a file. If it works for you at HQ then that will tell us something.
Cheers,
4S
http://seowhq.net/MP4public/Merger/default.php
You just click on the Date field and a calendar tool pops up. No typing is required.
I wonder if your MP version is corrupted or missing a file. If it works for you at HQ then that will tell us something.
Cheers,
4S
IV/JG7_4Shades
SEOW Developer
SEOW Developer
-
- Posts: 15
- Joined: Sat 21 Aug 2010 10:29 am
- Location: france
- Contact:
-
- Posts: 15
- Joined: Sat 21 Aug 2010 10:29 am
- Location: france
- Contact: