Hi to everybody,
Let you know some new ideas about seow management:
1. let the mission virtual duration (actually = 1 hour) be a campaign parameter;
2. have a template building utility working by mission planner interface; furthermore, have a routine to set the industrial production level (score) related to cost table, installation table, object table and the desired reinforcement capacity for each army (in other word, the rate of reinforcement - production points/nr. mission);
3. have a campaign "in progress" utility telling the summary of remaining forces
S!
Misc
Moderator: SEOW Developers